Mayfield, NY – On Saturday, May 7, as a precautionary measure, the Hudson River – Black River Regulating District activated the Conklingville Dam Emergency Action Plan (EAP) in response to an unusual change in a measurement taken at one of the monitoring points within the dam. Beginning immediately and continuing around the clock, the Regulating District’s Engineering staff has conducted intensive, physical and visual inspections of conditions at the Conklingville Dam. The Regulating District has determined that the unusual change in measurement triggering the alert resulted from a data reading error. As a result, the emergency action plan has been deactivated.